Lock Out – Tag Out
A Lock-Out Tag-Out (LOTO) isolation procedure operates at Manchester Tank & Equipment. All energy sources must be locked out prior to commencing work using the site’s LOTO safe operating procedures. The Site Contact must inform the Contractor of the correct procedure and the Contractor must comply with it. Yellow Caution “Out of Service” tags and Personal Red “Danger” tags and locks are to be used at all times.
Failure to comply with site’s LOTO requirements will result in dismissal from site.
A Contractor must review the site's LOTO procedure with the Site Contact before commencing working on site?